COURSE HORN: Site update

The ecology area has been tidied and ready for planting in the Spring. 200 bulbs have been planted along the pond edge, ready for a stunning display next Spring.


The 1st floor joists and block and beam ground floor have been completed.

Brickwork has begun along the base of the building. The feature wall at the front of Pond Barn will start soon. This is a striking feature that contrasts beautifully with the warm anthracite aluminium cladding and warm timber doors.